Steps

How long does solar installation take?
How is the utility permit obtained?

Installation takes 1–2 days and the system is ready within 14 days after 50% is paid. Solar D applies to MEA or PEA in your name; you never have to deal with the utility yourself.

7 steps

From design to selling power back

Step 1 · a few minutes

Design and choose a package

Enter your bill in the designer to see size, price and payback at once, or send a photo of your bill on LINE and the team will help you choose.

Step 2 · within 3 working days

Site survey

An engineer checks the roof, structure, electrical board and meter, then confirms the design and price before you decide; any extra work is listed item by item.

Step 3 · one day

Confirm and pay in instalments

Book your install date with 10% of the price, then pay by the milestones written in the quotation.

Step 4 · done by Solar D

Apply to the utility

Solar D prepares engineer-certified electrical drawings and applies for connection to MEA (Bangkok, Nonthaburi, Samut Prakan) or PEA (other provinces) in the meter owner's name.

Step 5 · 1–2 days

Install

The Solar D team installs the panels, inverter and electrical board, with photos of every step in My Solar D.

Step 6 · within 14 days after 50% is paid

Handover and start using it

System test, app walkthrough and warranty documents.

Step 7 · on the utility's schedule

Utility inspection and meter change

The utility inspects the system and fits a meter that counts exported power; Solar D follows up and posts progress in My Solar D.

What you prepare

4 items, sent one by one in the app

  • Latest electricity bill (showing the meter owner's name and account number)
  • Copy of the meter owner's ID card
  • Copy of the house registration
  • Photo of the house front and its location (map pin)

Done by Solar D

Everything else

  • Engineer-certified electrical drawing (single line diagram)
  • Certificates for panels and inverters on the utility's approved list
  • Filing the application and answering correction requests
  • Booking the utility inspection and meter change
  • Applying to sell surplus at 2.20 baht per unit (if eligible)

FAQ

Questions about the steps and permits

How long does solar installation take?

A typical home installs in 1–2 days. From booking to use, the system is ready within 14 days after 50% is paid. The utility's inspection and meter change follow each utility district's schedule.

How is the utility permit obtained?

Solar D applies in the meter owner's name to MEA (Bangkok, Nonthaburi, Samut Prakan) or PEA (other provinces), with engineer-certified drawings and documents for utility-approved equipment. You prepare only 4 things: your latest electricity bill (showing the meter owner's name and account number) · a copy of the meter owner's ID card · a copy of the house registration · a photo of the house front and its location (map pin)

Do I need a building permit?

A typical home with panels on the existing roof, where panels and frame weigh no more than 20 kg per square metre, does not need a building modification permit. An engineer checks the structure during the survey; above that limit, Solar D files with the local authority for you.

Do I have to deal with the utility myself?

No. Solar D prepares the documents, files them, answers correction requests and books the utility inspection. You follow the status in My Solar D.

Can I sell power back right after installation?

After the utility approves and changes the meter: 2.2 baht per unit, up to 5 kW per meter, under the utilities' residential solar programme.

200,000 tax deduction Warranty My Solar D

Ready to start

Design your system in 2 minutes, or send a photo of your bill to the team on LINE.